The Moscow Metrostroy has begun the construction of a ventilation tunnel, which is necessary for launching the left branch at the Likhobory depot. Let me remind you that with the launch of the northern section of the LDL, only the right branch was put into operation, since it was possible to find a place for the ventilation shaft right next to the tunnel. But for the construction of the left branch, it is necessary to build approach tunnels about 100 meters long.
Very unusual penetration! meters, tunnels, penetration, angle, tunnel, branch, diameter, shield, demanded, Moscow, made, this, will, more, therefore, right, construction, ground, camera, camera

Initially it was assumed that the ventilation of both branches in the depot would be carried out from this trunk, but for this it was necessary to pass 100 meters in one case, and even more in another in the quicksand. Therefore, to launch the right branch, a new trunk was made, and then they began to think what to do. Three options were considered:
1. Penetration by hand. This would require the use of a freeze on the entire length of the ventilation tunnel. Plus it is very unsafe.
2. The penetration of a conventional distilling plate with a diameter of 6 meters. This would require the construction of installation and demolition chambers of a large span in unstable soils (and most likely with freezing). As well as the length of the complex would be greater than the length of penetration.
3Driving a small shield of two tunnels (to provide the required cross-sectional area). This method avoids the construction of large chambers in unstable soils (you can do with a diameter of 8.5 meters) and the complete absence of frost. But it requires two tunnels.
After comparing all the options, the third one was adopted.
1. The trunk, covered with the help of high-speed rail, to a depth of 38 meters. There is just the boundary of limestone and quicksand.
Very unusual penetration! meters, tunnels, penetration, angle, tunnel, branch, diameter, shield, demanded, Moscow, made, this, will, more, therefore, right, construction, ground, camera, camera

2. All equipment is loaded into the bucket and goes down.
Very unusual penetration! meters, tunnels, penetration, angle, tunnel, branch, diameter, shield, demanded, Moscow, made, this, will, more, therefore, right, construction, ground, camera, camera

3. We are all legs and stairs.
Very unusual penetration! meters, tunnels, penetration, angle, tunnel, branch, diameter, shield, demanded, Moscow, made, this, will, more, therefore, right, construction, ground, camera, camera

4. At the bottom I was immediately surprised that the lining was at a strange angle.
Very unusual penetration! meters, tunnels, penetration, angle, tunnel, branch, diameter, shield, demanded, Moscow, made, this, will, more, therefore, right, construction, ground, camera, camera

5. And the shield is mounted at an angle to the axis.
Very unusual penetration! meters, tunnels, penetration, angle, tunnel, branch, diameter, shield, demanded, Moscow, made, this, will, more, therefore, right, construction, ground, camera, camera

6. And everything turned out to be simple. As you can see, in the diagram, two tunnels together represent an oval. TPMK will pass the lower tunnel, in its right chamber it will be deployed and it will return to the launch chamber. But in order for it to fit into the pivot camera, there it must come at a certain angle. Therefore, the lower tunnel and made on such a curve.
Very unusual penetration! meters, tunnels, penetration, angle, tunnel, branch, diameter, shield, demanded, Moscow, made, this, will, more, therefore, right, construction, ground, camera, camera

7. The start to the shield, called “Agata, was given by Oleg Nikolaevich Melnikov. Deputy General Director of the Moscow Metrostroy. He had a birthday that day, Oleg Nikolayevich turned 55 years old.And he began his career at the Moscow Metrostroy in 1981.
Very unusual penetration! meters, tunnels, penetration, angle, tunnel, branch, diameter, shield, demanded, Moscow, made, this, will, more, therefore, right, construction, ground, camera, camera

8. The shield constructs the lining with an outer diameter of 3.6 meters, and the internal one - 3.2. The operator sits on the surface. A shield manufactured by the Japanese corporation IHI has already built five tunnels in Moscow.
Very unusual penetration! meters, tunnels, penetration, angle, tunnel, branch, diameter, shield, demanded, Moscow, made, this, will, more, therefore, right, construction, ground, camera, camera

9. The first cubic meter of rock!
Very unusual penetration! meters, tunnels, penetration, angle, tunnel, branch, diameter, shield, demanded, Moscow, made, this, will, more, therefore, right, construction, ground, camera, camera

10. For Moscow Metrostroy and Moscow, this will be the first experience of turning the shield in an underground chamber. In this operation, the distance between the lining of the tunnel and the skirt of the shield will be only 10 centimeters. By the way, the shield was assembled on the surface and lowered into the mine vertically, with the rotor down. At the bottom, it was deployed (using a hinged joint in the design of the shield for flexibility and tunnels of small radius) and mounted in the starting position.
Very unusual penetration! meters, tunnels, penetration, angle, tunnel, branch, diameter, shield, demanded, Moscow, made, this, will, more, therefore, right, construction, ground, camera, camera

The management company for the construction of the Big Ring Line and other new stations and lines in Moscow is Mosinzhproekt JSC. Construction work is being carried out by various contractors, including Mosmetrostroy, Engeocom, MIP-Stroy No. 1, IBT, TransInzhstroy and CRCC and others.

Related news

Very unusual penetration image, picture, imagery


Very unusual penetration 41


Very unusual penetration 6


Very unusual penetration 14


Very unusual penetration 65


Very unusual penetration 63


Very unusual penetration 1


Very unusual penetration 94


Very unusual penetration 72